Projects / Stafford College - Broadeye Building: |
![]() |
Location: Stafford College, Stafford Contract Value: £ 173,000.00 M&E Consultant: Cundall |
![]() |
![]() |
Upon Instruction, McDowall’s had 1 week to procure the Daikin Europe air conditioning equipment and start work across 4 college floors, installing four separate systems all controlled via a Daikin I Touch controller and completed in 6-8 weeks. Part of the scheme involved providing electrical mains power to the air conditioning equipment and bringing the existing fresh air ventilation system back on line and re-commissioning all systems as follows: • 45 No. internal fan coil units linked to • 4 No. VRVIII inverter driven condensing units • Existing fresh air ventilation system refurbishment • Automatic I Touch controls, Testing & Commissioning & O & M’s |